Certified according to:
EN 15266
Safe
Efficient
Flexible

Hauptinhalt

Advantages

As a system solution, the BOAGAZ gas installation system offers numerous advantages when compared to conventional systems. Let yourself be convinced!

MAXIMUM SAFETY

  • connectionless pipe-laying
  • lengths from 15 m right up to 640 m in one section
  • connection points are kept to a minimum
  • double-seal connectors and couplings  
  • pipes undergo 100% inspections for leaks before leaving the factory
  • end-to-end yellow corrosion protection

TIME AND COST SAVINGS

  • savings in time of up to 70%
  • low or zero investment costs
  • economies of scale attainable in terms of time and costs expended as project size increases
  • error-free gas installations
  • reduction of material wastage to a minimum
  • rapid calculation of amount of material required and simple calculation
  • quicker checks for leaks because connection points are kept to a minimum

COMFORTABLE WORKPLACE CONDITIONS AND HANDLING

  • rolled products easy to transport
  • no elbow joints – bends can be created by hand if required 
  • no special tools (corrugated pipe cutters, knives and pipe wrenches are all that are required)
  • no preparation of sealing surfaces
  • standard lengths weighing little
  • efficient and safe creation of leak-tight connections
  • simplifies working overhead

QUALITY AND EXPERTISE

  • high-quality material (stainless steel 1.4404/brass)
  • quality from the European experts in PLT systems
  • personal support and contact persons
  • over 40 years of market experience worldwide
  • widest range of connectors and couplings
  • complies with EN 15266
  • certified by: ÖVGW, DVGW, ATG, BSI Kitemark, SVGW

 

ADVANTAGES IN A WIDE VARIETY OF INSTALLATION LOCATIONS

  • for small and large-scale projects in new constructions and renovation work
  • advantages during installation
    • under screed
    • under plaster
    • buried
    • in structures employing dry construction techniques
    • in cramped locations with nooks and crannies/difficult installation conditions
    • where there are unexpected obstacles
    • where there is little space to connect to the meter
    • when working under pressure in large-scale projects
    • when connecting to kitchen islands
    • hall heating

Sample installation

Call Now